Last week after my staff and I moved into our new school building, the old one was officially abandoned. Yesterday morning, the construction crew started stripping away the metal roofing and the wooden beams which held the roof in place. This morning, mini excavators were hoisted into the second floor had started tearing away the old partitions, windows and floor boards. When the workers went on lunch break, I went inside to take a last look of this 44 year old building before it was reduced to rubble. It was a bit dodgy since the floor was now scattered with shards of glass, metal and wood. Parts of the hallway were blocked off with rubbish that was eventually going to be removed.